Module 01

Rail Project Status Tracker

Where each project genuinely stands — demanded, surveyed, sanctioned, tendered or actually under construction — with the document that says so.

12 of 12 projects

Sanctioned in 1997-98 to connect Angamaly with Erumeli/Sabarimala. Only about 7 km near Kalady was built before work stalled over land acquisition and cost sharing. Kerala has repeatedly offered a 50% cost share to revive it.

Sanctioned
1997
Cost
₹3,800.94 cr
Length
111 km
Updated
28 Jul 2026

A third line on Kerala's most saturated section. Detailed project report prepared; sanction pending.

Sanctioned
Cost
₹3,400 cr
Length
106 km
Updated
28 Jul 2026

Doubling of the Thrissur–Guruvayur branch line to support pilgrim traffic and allow the proposed Guruvayur–Tirunavaya extension.

Sanctioned
2018
Cost
₹232 cr
Length
24 km
Updated
28 Jul 2026

Sanctioned new line that would create an alternative Shoranur bypass route along the coast. Progress has been minimal due to land acquisition.

Sanctioned
2010
Cost
₹750 cr
Length
49 km
Updated
28 Jul 2026

Proposed line connecting Kanhangad in Kasaragod with Kaniyur in Karnataka, giving north Kerala a direct rail link to Bengaluru.

Sanctioned
Cost
₹2,100 cr
Length
89 km
Updated
28 Jul 2026

Kollam–Punalur Doubling

Under construction

Doubling of the Kollam–Punalur section on the Kollam–Sengottai line, taken up after the broad-gauge conversion.

Sanctioned
2019
Cost
₹410 cr
Length
44 km
Updated
28 Jul 2026

A satellite coaching terminal at Nemom to decongest Thiruvananthapuram Central and allow more originating trains.

Sanctioned
2015
Cost
₹133 cr
Length
Updated
28 Jul 2026

Proposed link between Nilambur in Malappuram and Nanjangud in Karnataka via Wayanad, giving Kerala a second broad-gauge corridor into Karnataka. Final location survey completed; the project has not been sanctioned owing to forest clearance and Karnataka's reluctance.

Sanctioned
Cost
₹7,500 cr
Length
236 km
Updated
28 Jul 2026

Doubling of the Palakkad Junction–Pollachi section, part of the Palakkad–Dindigul corridor. Currently single line; doubling has been demanded to improve freight and passenger throughput toward Tamil Nadu.

Sanctioned
Cost
₹600 cr
Length
55 km
Updated
28 Jul 2026

A bypass line to let Mangaluru-bound trains avoid reversal and congestion at Shoranur Junction. Repeatedly demanded by passenger associations; included in surveys but not sanctioned.

Sanctioned
Cost
₹300 cr
Length
5 km
Updated
28 Jul 2026

Long-demanded line linking Thalassery with Mysuru through Wayanad. Kerala has sought a survey; the alignment crosses ecologically sensitive stretches.

Sanctioned
Cost
₹6,000 cr
Length
180 km
Updated
28 Jul 2026

Doubling of the Thiruvananthapuram Central–Kanyakumari section, completed and commissioned in phases.

Sanctioned
2011
Cost
₹540 cr
Length
86 km
Updated
28 Jul 2026